CConvCtr1.jpgCConvCtr2.jpgCConvCtr3.jpg

Charlotte Convention Center

Location: Charlotte, NC
Year Completed: 1994

This structure had 90’-0” x 90’-0” bays which required long span trusses that were limited in depth to under 10’-0”.  With the vast open space requirements the lateral force resisting system was very unique and challenging.

Architect: FWA Group